| Parameter | Working capability | Conditions |
|---|---|---|
| Hook-lift container system | Swaps a full container for an empty one in minutes, so one chassis serves many sites per day | Matched container geometry and stable, level lifting ground |
Capability figures are reference estimates, not factory guarantees; actual results vary with operating conditions.
| Model No. | CLW5180ZXXD6 |
|---|---|
| Drive layout | 4×2 |
| Rated volume | 12000 L |
| Dimensions | 7300, 7500, 6570×2470×3150, 3080 mm |
| Transmission | Manual |
| Fuel | Diesel |
| Emission standard | Euro 2 / 3 / 4 / 5 / 6 |
| Certification | ISO9000, CCC, TS16949, EPA, EEC, RoHS, CE |
| Special Equipment Features Safety | ABS |
|---|
| Basic Information Maximum Speed | 89 km/h |
|---|
Fit check
Suitable and unsuitable duty
Suitable for
- Transfer runs between collection points and disposal sites
- Markets, estates and demolition sites with container swap duty
- One-chassis-many-container fleet patterns
Not suitable for
- Scheduled household bin rounds — a rear-loader compactor fits better
- Long-distance bulk haulage beyond container volume
Configuration
Standard and optional equipment
Standard
- Hook-lift frame with hydraulic arms
- Stability legs and safety valves
- Matched container geometry
Optional
- Container sizes and quantities quoted with the truck
- RHD or LHD layout where offered
After-sales
Parts and support
Parts list and operation guidance ship with the truck; a direct line to the engineering team covers commissioning questions, and wear parts are stocked for repeat orders.
Key features
- Dongfeng chassis with 4×2 layout
- Working capacity: 12000 L
This Dongfeng hook lift truck is a container-swap workhorse for Nigerian waste contractors, transfer stations and site-clearance fleets. One chassis serves many containers: drop a full box, pick up an empty one, keep the bins working on the ground while the truck keeps moving.
Arm ratings, cycle behaviour and steering layout options are listed in the specification tables below with the conditions they were measured under. Containers ship on the same load plan as the truck when ordered together — matched geometry means the hook engages first time, every time.
Quotations are factory-direct and itemised, FOB or CIF to Apapa, Tin Can or Onne, with SONCAP support documents prepared with the truck. Compare units on the refuse trucks family page and review the duty reference when budgeting a truck-plus-containers package.
Same family
Compare other units in this family
Delivery
Lead time and shipping
25–40 days production for standard builds, plus ocean shipping.
- RoRo or container shipment to Lagos (Apapa / Tin Can) or Onne. Marine insurance through a Nigerian insurer and SONCAP support documents arranged as part of the export file.
Indicative FOB range from the factory listing; final quotation depends on specification, quantity and freight at shipment. CIF Apapa / Tin Can / Onne available on request.
Nigeria desk
Landed cost in Nigeria — estimate
Illustrative estimate only. Duty, levies, VAT and clearing are assessed on the CIF value — confirm current HS chapter 87 treatment with your clearing agent, and ask the sales desk for the landed-cost worksheet with your quotation.
Export documentation
Documents we provide with this truck
- Commercial invoice
- Packing list
- Certificate of origin
- Hydraulics schematic and body test records
- Bin-lift certification (where fitted)
- SONCAP support package
- Bill of lading
Payment & delivery
Payment plans and shipment
Typical terms: 30% T/T deposit with order, 70% balance against shipping documents. Irrevocable L/C at sight available for qualifying buyers; staged shipments for fleet orders.
Questions
Frequently asked
What are your terms of payment?
T/T with a 30% deposit and a 70% balance will be paid before delivery. We will show you photos of the products and packages before you pay the balance.
What's your minimum quantity?
1 set.
What is your packing and shipping method?
Naked packing, we transport our trucks by bulk cargo carrier, ro-ro or 40/45 HQ, or land transportation.
How about delivery time?
Generally speaking, 25 workdays after we received 30% of the contract value T/T down payment. The specific delivery time depends on the products and the quantity of your order.
Supply assurance
Authorization, inspection and certification
Authorization: Factory-direct supply from the Chengli manufacturing base; dealer authorization documents available on request.
Inspection: Third-party pre-shipment inspection (SGS / BV / TÜV) can be arranged before loading; photographic build reports provided.
Certification: Chassis and vehicle certificates supplied with shipment; destination-market certifications per current SON / regulator requirements — confirm before ordering.
Indicative pricing only — request a current quotation before ordering.